SAN BORJA ARRIARÁN HOSPITAL, CHILE.

Program:  Hospital.

Size: 30,.230 m².

Cost: Not informed.

Sector: Public.

Information: Not available.

 

The architecture office MM-AC was awarded the redesign of the damaged areas of the Hospital Clínico San Borja Arriarán, a project in which BuildBIM currently leads the management and BIM Coordination of the project with the aim of achieving a BIM Level 3, which would be the first of its kind in healthcare projects in Chile.  The medical complex is located in Santiago and includes more than 30,000 m2 distributed in operational floors and technical roof. The initiative aims to restore, normalise and optimise the services damaged at the beginning of 2021, maintaining the remaining structure and incorporating new standards and current regulatory requirements.


BIM maturity level 3 has advantages over previous levels, as all the potentialities of the BIM methodology are achieved. One of its most relevant features is that all data and information are shared in a Common Data Environment (CDE) hosted in the cloud, allowing the agents involved in the project to access a single source of information.

The project team and the Metropolitan Health Service review the effects of each action on the model in real time. This standard greatly facilitates the process for the actors involved and makes decision-making transparent, integrating coordination from the first design phase, which translates into a more efficient building process.

  • BIM Healthcare
  • BIM Hospital