Size: 3.460m2
Cost: 7.8M USD
Sector: Hospitality
The project for the Hotel Santa Magdalena has 9 floors and 4 underground levels in approx. 3460 m2. BuildBIM was commissioned by the RQ Hotel Group for the coordination of all specialties including, Architecture, Structural Calculation, Sewer, Rainwater, Potable Water, Air Conditioning, Electricity, Weak Currents, Garbage and Elevators. In the process of interference analysis, 636 conflicts were found, which were grouped according to their degree of complexity, defining inconsistencies and omissions in the projects. Construction cost savings have been estimated in at least USD 105K due to early BIM Clash Detection and BIM Coordination in the design stage.